Demo

Electrical Project Manager of Commissioning (Data Center Construction Experience)

InPwr
Indianapolis, IN Full Time
POSTED ON 1/23/2025 CLOSED ON 2/22/2025

What are the responsibilities and job description for the Electrical Project Manager of Commissioning (Data Center Construction Experience) position at InPwr?

InPwr, Inc. is looking for a seasoned Project Manager of Commissioning to join our dynamic team! We are an award-winning electrical design-build firm headquartered in Indianapolis, IN, with offices in Denver, CO, Los Angeles, CA, and Naples, FL. Named a 2019, 2022, 2023, and 2024 Top Places to Work, we believe in building it better, focus on complex opportunities, and taking the electrical design to the next level, with licenses in over forty states and projects across the nation.


We InPwr people through personal commitment, relentless dedication, and driving results together.


Come Join our Team!


Benefits:

  • Medical, Dental, Vision and Life Insurance 100% company paid for employees
  • Paid vacation & holidays
  • 401(k) company match
  • 30-day paid sabbatical every 5 years of employment
  • Stable employment with a growing company
  • Highly competitive salary


Essential Functions:

  • Project Planning: The Project Manager leads the development of the commissioning plan, which outlines the scope, schedule, resources, and procedures for commissioning the data center's infrastructure. This involves collaborating with stakeholders, including design engineers, construction teams, and facility operators.
  • Coordination: Coordinate commissioning activities with various project stakeholders to ensure alignment with project milestones and deadlines. This includes scheduling equipment installations, testing, and integration activities to minimize disruption to the project timeline.
  • Vendor Management: Liaises with equipment vendors and subcontractors involved in commissioning activities, ensuring that equipment is delivered on time, installed correctly, and tested according to specifications.
  • System Integration: Oversee the integration of various data center systems, including electrical, mechanical, fire suppression, security, and environmental monitoring systems. This involves testing interoperability, communication protocols, and failover mechanisms to ensure seamless operation.
  • Testing and Verification: Oversees the execution of functional and performance tests on critical infrastructure components, such as power distribution systems, cooling systems, UPS (Uninterruptible Power Supply) systems, generators, and data center management software. They ensure that systems meet design specifications and performance requirements.
  • Documentation: Maintain accurate records of commissioning activities, including test procedures, test results, equipment specifications, and as-built documentation. This documentation serves as a reference for future maintenance, troubleshooting, and expansion of the data center facility.
  • Risk Management: Identifies and mitigates risks associated with commissioning activities, such as equipment failures, system vulnerabilities, and operational disruptions. They develop contingency plans and escalation procedures to address unforeseen challenges.
  • Quality Assurance: Enforce quality standards throughout the commissioning process, ensuring that workmanship meets industry best practices and regulatory requirements. This includes conducting inspections, audits, and reviews to identify and rectify deficiencies.
  • Client Communication: Provides regular updates to the client or project stakeholders on the progress of commissioning activities, including milestones achieved, issues encountered, and resolution plans. They address client concerns and requests in a timely and professional manner.
  • Training and Handover: Facilitates training sessions for data center operations staff on the use and maintenance of critical infrastructure systems. Ensure a smooth handover of the facility to the client upon completion of commissioning activities, including documentation turnover and final acceptance procedures.


Other essential functions:

  • Travel required to different sites. 75% of travel required.
  • Perform a Daily report on site.
  • Be professional in all aspects.
  • Communicate professional to the GC, EC, and Owner
  • Oversees meetings, schedules, and testing.
  • Able to create the Final Building report in conjunction with ECx, MCx and FLS.
  • Responsible for expense reports and following company policies.
  • Strong Organizational and documentational


Skills and Requirements:


  • Certificates and Knowledge
    • Bachelor or similar
    • Master’s degree of Administrator (MBA) - optional
    • 3-5 years of experience 
    • HV Substations, MV SWGR, LV SWGR, Busway, UPS, Generator, PDU, RPP, others
    • NFPA 70E
    • OSHA 10
    • Complete all Safety Certifications
    • Daily Reports
    • Knowledge of CAD, Bluebeam, and others.
  • Ability to work directly on site in GA, and ability to travel required


    Working/ Environment/ Physical Demands to successfully perform the essential functions of this job:

    • Job Requires working in all elements, depending on job location, time of year.
    • Must be able to utilize construction site sanitary facilities.
    • Work in restricted areas.
    • Wear personal protective equipment (hard hat, safety glasses always), respirator when required.
    • Able to work 8-10 hours per day, 40-50 hours per week.


    EEO, Drug Free Workplace Safety has always been our priority. Along with the usual protocols to protect our workforce, vendors, and business partners, we’ve implemented additional safety standards, specifically in response to minimizing the possibility of transmission of the COVID-19 virus. Along with CDC recommended guidelines associated with hand-sanitization and safe-distancing, we’ve established procedures to reduce exposure and susceptibility. These include providing personnel with appropriate PPE, limiting non-essential foot traffic, added cleaning protocols, and encouraging open lines of communication for feedback, questions, and concerns. Employment contingent upon successful completion of background investigation and drug screening. Smoke-free workplace. Drug-free work environment according to Federal Law.


    Visit us at www.inpwrinc.com to apply online!

    Salary.com Estimation for Electrical Project Manager of Commissioning (Data Center Construction Experience) in Indianapolis, IN
    $104,286 to $138,180
    If your compensation planning software is too rigid to deploy winning incentive strategies, it’s time to find an adaptable solution. Compensation Planning
    Enhance your organization's compensation strategy with salary data sets that HR and team managers can use to pay your staff right. Surveys & Data Sets

    What is the career path for a Electrical Project Manager of Commissioning (Data Center Construction Experience)?

    Sign up to receive alerts about other jobs on the Electrical Project Manager of Commissioning (Data Center Construction Experience) career path by checking the boxes next to the positions that interest you.
    Income Estimation: 
    $107,623 - $139,321
    Income Estimation: 
    $133,494 - $170,282
    Income Estimation: 
    $131,105 - $151,214
    Income Estimation: 
    $128,269 - $173,633
    Income Estimation: 
    $157,111 - $225,157
    Income Estimation: 
    $88,573 - $114,377
    Income Estimation: 
    $115,491 - $158,336
    Income Estimation: 
    $102,413 - $133,130
    Income Estimation: 
    $109,705 - $144,044
    Income Estimation: 
    $119,541 - $162,386
    Income Estimation: 
    $101,775 - $148,346
    Income Estimation: 
    $133,494 - $170,282
    Income Estimation: 
    $131,105 - $151,214
    Income Estimation: 
    $128,269 - $173,633
    Income Estimation: 
    $157,111 - $225,157
    Income Estimation: 
    $138,649 - $191,575
    Income Estimation: 
    $182,502 - $249,036
    Income Estimation: 
    $207,946 - $249,343
    Income Estimation: 
    $175,165 - $219,883
    Income Estimation: 
    $182,642 - $260,237
    Income Estimation: 
    $115,491 - $158,336
    Income Estimation: 
    $133,494 - $170,282
    Income Estimation: 
    $131,105 - $151,214
    Income Estimation: 
    $128,269 - $173,633
    Income Estimation: 
    $157,111 - $225,157
    This job has expired.
    Employees: Get a Salary Increase
    View Core, Job Family, and Industry Job Skills and Competency Data for more than 15,000 Job Titles Skills Library

    Job openings at InPwr

    • InPwr Indianapolis, IN
    • InPwr, Inc. is looking for an Admin Coordinator - Information Systems (IS) to join our dynamic team! We are an award-winning electrical design-build firm h... more
    • 8 Months Ago

    • InPwr Indianapolis, IN
    • InPwr, Inc. is looking for a seasoned Electrical Commissioning Engineer to join our dynamic team! We are an award-winning electrical design-build firm head... more
    • 8 Months Ago

    • InPwr Denver, CO
    • InPwr, Inc. is looking for a BIM Modeler to join our dynamic team! We are an award-winning electrical design-build firm headquartered in Indianapolis, IN, ... more
    • 8 Months Ago

    • InPwr Denver, CO
    • InPwr, Inc. is looking for a Project Manager to join our dynamic team! We are an award-winning electrical design-build firm headquartered in Indianapolis, ... more
    • 8 Months Ago


    Not the job you're looking for? Here are some other Electrical Project Manager of Commissioning (Data Center Construction Experience) jobs in the Indianapolis, IN area that may be a better fit.

    AI Assistant is available now!

    Feel free to start your new journey!