Demo

Mechanical Commissioning Engineer (Data Center Construction Experience)

InPwr
Indianapolis, IN Full Time
POSTED ON 12/16/2024 CLOSED ON 2/15/2025

What are the responsibilities and job description for the Mechanical Commissioning Engineer (Data Center Construction Experience) position at InPwr?

InPwr, Inc. is looking for a seasoned Mechanical Commissioning Engineer to join our dynamic team! We are an award-winning electrical design-build firm headquartered in Indianapolis, IN, with offices in Denver, CO, Los Angeles, CA, and Naples, FL. Named a 2019, 2022, 2023, and 2024 Top Places to Work, we believe in building it better, focus on complex opportunities, and taking the electrical design to the next level, with licenses in over forty states and projects across the nation.


We InPwr people through personal commitment, relentless dedication, and driving results together.


Come Join our Team!


Benefits:

  • Medical, Dental, Vision and Life Insurance 100% company paid for employees
  • Paid vacation & holidays
  • 401(k) company match
  • 30-day paid sabbatical every 5 years of employment
  • Stable employment with a growing company
  • Highly competitive salary


Essential Functions:

  • Planning and Coordination: Participate in the planning and coordination of commissioning activities, working closely with project managers, design engineers, construction teams, and other stakeholders to ensure that commissioning activities are properly scheduled and executed.
  • Installation Verification: Verify that mechanical systems and equipment are installed according to design specifications, manufacturer's recommendations, and applicable codes and standards. This involves reviewing installation drawings, conducting site inspections, and ensuring proper alignment, assembly, and connections.
  • Functional Testing: Perform functional tests on mechanical systems and equipment to ensure they operate as intended. This may include testing components such as pumps, motors, valves, actuators, HVAC systems, plumbing fixtures, and other mechanical devices to verify their performance and functionality.
  • Performance Testing: Conduct performance tests to verify that mechanical systems meet performance requirements under normal operating conditions as well as during peak loads or other demanding scenarios. This may involve testing parameters such as flow rates, temperatures, pressures, vibration levels, and energy efficiency.
  • Documentation: Document all aspects of the commissioning process, including test procedures, test results, equipment specifications, and any modifications or adjustments made during commissioning. Accurate documentation is essential for compliance, future reference, and handover to operations and maintenance teams.
  • Training: Provide training to operations and maintenance personnel on the proper operation and maintenance of mechanical systems and equipment. This helps ensure that personnel are familiar with the systems they will be responsible for operating and maintaining.
  • Safety Compliance: Ensure that all commissioning activities are conducted in compliance with applicable safety regulations and standards to protect personnel and property. This includes implementing safety procedures, conducting risk assessments, and providing appropriate personal protective equipment (PPE) as needed.
  • Commissioning Reports: Finally, they compile commissioning reports summarizing the results of the commissioning process, documenting any issues or deficiencies identified, and providing recommendations for corrective actions or further optimization.
  • The role requires a strong foundation in mechanical engineering principles (BSME), practical experience with electrical systems and equipment, excellent problem-solving skills, attention to detail, and the ability to work effectively in multidisciplinary teams.


Other essential functions:

  • Travel required to different sites. 75% of travel required.
  • Perform a Daily report on site.
  • Be professional in all aspects.
  • Communicate professional to the GC, EC, and Owner
  • Oversees meetings, schedules, and testing.
  • Lead the Mechanical job and perform a daily meeting with Owner, GC, EC and others.
  • Mechanical team lead on site.
  • Responsible for expense reports and following company policies.
  • Oversees the QA/QC and commissioning on their area of work.
  • Able to create the Final Building report in conjunction with ECx, MCx and FLS.
  • Strong Organizational and documentational.


Skills and Requirements:


  • Certificates and Knowledge
    • Bachelor of Science of Mechanical Engineering.
    • HVAC, CRAC, AHU, ACCU, others
    • OSHA 10
    • Complete all Safety Certifications
    • Script development for L2-L5
    • Daily Reports
      • Knowledge of CAD, Bluebeam, and others
    • Ability to work directly on site, and ability to travel required


      Working/ Environment/ Physical Demands to successfully perform the essential functions of this job:

      • Job Requires working in all elements, depending on job location, time of year.
      • Must be able to utilize construction site sanitary facilities.
      • Work in restricted areas.
      • Wear personal protective equipment (hard hat, safety glasses always), respirator when required.
      • Able to work 8-10 hours per day, 40-50 hours per week.


      EEO, Drug Free Workplace Safety has always been our priority. Along with the usual protocols to protect our workforce, vendors, and business partners, we’ve implemented additional safety standards, specifically in response to minimizing the possibility of transmission of the COVID-19 virus. Along with CDC recommended guidelines associated with hand-sanitization and safe-distancing, we’ve established procedures to reduce exposure and susceptibility. These include providing personnel with appropriate PPE, limiting non-essential foot traffic, added cleaning protocols, and encouraging open lines of communication for feedback, questions, and concerns. Employment contingent upon successful completion of background investigation and drug screening. Smoke-free workplace. Drug-free work environment according to Federal Law.


      Visit us at www.inpwrinc.com to apply online!

      Salary.com Estimation for Mechanical Commissioning Engineer (Data Center Construction Experience) in Indianapolis, IN
      $86,913 to $103,727
      If your compensation planning software is too rigid to deploy winning incentive strategies, it’s time to find an adaptable solution. Compensation Planning
      Enhance your organization's compensation strategy with salary data sets that HR and team managers can use to pay your staff right. Surveys & Data Sets

      What is the career path for a Mechanical Commissioning Engineer (Data Center Construction Experience)?

      Sign up to receive alerts about other jobs on the Mechanical Commissioning Engineer (Data Center Construction Experience) career path by checking the boxes next to the positions that interest you.
      Income Estimation: 
      $108,186 - $133,193
      Income Estimation: 
      $134,236 - $174,128
      Income Estimation: 
      $132,162 - $161,329
      Income Estimation: 
      $73,784 - $86,677
      Income Estimation: 
      $90,372 - $103,622
      Income Estimation: 
      $61,825 - $80,560
      Income Estimation: 
      $90,032 - $105,965
      Income Estimation: 
      $85,996 - $102,718
      Income Estimation: 
      $85,996 - $102,718
      Income Estimation: 
      $111,859 - $131,446
      Income Estimation: 
      $110,457 - $133,106
      Income Estimation: 
      $105,809 - $128,724
      Income Estimation: 
      $122,763 - $145,698
      Income Estimation: 
      $105,809 - $128,724
      Income Estimation: 
      $136,611 - $163,397
      Income Estimation: 
      $135,163 - $163,519
      Income Estimation: 
      $131,953 - $159,624
      Income Estimation: 
      $150,859 - $181,127
      This job has expired.
      Employees: Get a Salary Increase
      View Core, Job Family, and Industry Job Skills and Competency Data for more than 15,000 Job Titles Skills Library

      Job openings at InPwr

      • InPwr Indianapolis, IN
      • InPwr, Inc. is looking for an Admin Coordinator - Information Systems (IS) to join our dynamic team! We are an award-winning electrical design-build firm h... more
      • 8 Months Ago

      • InPwr Indianapolis, IN
      • InPwr, Inc. is looking for a seasoned Electrical Commissioning Engineer to join our dynamic team! We are an award-winning electrical design-build firm head... more
      • 8 Months Ago

      • InPwr Denver, CO
      • InPwr, Inc. is looking for a BIM Modeler to join our dynamic team! We are an award-winning electrical design-build firm headquartered in Indianapolis, IN, ... more
      • 8 Months Ago

      • InPwr Denver, CO
      • InPwr, Inc. is looking for a Project Manager to join our dynamic team! We are an award-winning electrical design-build firm headquartered in Indianapolis, ... more
      • 8 Months Ago


      Not the job you're looking for? Here are some other Mechanical Commissioning Engineer (Data Center Construction Experience) jobs in the Indianapolis, IN area that may be a better fit.

      • Shiel Sexton Indianapolis, IN
      • Anova Technical Services is a growing professional service organization headquartered in Indianapolis, Indiana with project locations across the US. Our cl... more
      • 8 Months Ago

      • Anova Indianapolis, IN
      • Anova Technical Services is a growing professional service organization headquartered in Indianapolis, Indiana with project locations across the US. Our cl... more
      • 8 Months Ago

      AI Assistant is available now!

      Feel free to start your new journey!